
Marina Installation
Vinyl Surface |

Large Deck Area |

Cedar Surface |

Dock with Optional Flagpole |
|
| Each
dock section is designed to hold 80 lbs. of water in its 100% welded frame. This
feature adds stability and helps to hold the dock system in place during storms, high
winds, and wave action. The |
 |
| water is drained by removing the plugs under each
section before removal in the fall. |
|
| The
4' x 8' sections are connected end-to- end and side-to-side by our unique inter- locking
hinge. The first sections can form a ramp up or down allowing the dock system to
adapt to any shoreline. If you have steps, a retaining wall, or another dock and |
 |
| connect our dock, the Starter Hinge
will give you the start you need. |
|
| Pier Pleasure's adjustable legs allow
leveling from the top of the dock without entering the water. Each leg levels inde-
pendently and there are no set screws or holes to line up. The leg adjustment
carries a full lifetime warranty. Our dock legs
are braced from side-to- side and front-to-back for maximum stability. There are no
leg posts above the dock surface and the legs do not need to be removed. This makes
installation, |
|
| removal, and storage easier. It also maintains
a clean appearance. |
|
| Height
indicators on each leg make leveling easy and accurate. The indicators show you the
distance from the top of the dock to the surface of the water. All bolts, pins, and fasteners in the dock system are stainless steel which |
 |
| means no corrosion, no maintenance, and long-term
clean appearance. |
|
|